9001cc金沙以诚为本

News

news center

Production News Express

Delivery of 1800 TEU container ship "CELANDINE" and departure from the yard

2023-08-21 views 161

On August 19, an 1800TEU container ship "CELANDINE" slowly left the wharf of the shipyard and was put into operation. The ship has a total length of 171.9 meters, a moulded width of 28.4 meters, and a moulded depth of 14.5 meters, and has entered the ABS Classification Society. Our group and the shipowner Shengping Logistics completed the delivery of the ship by means of electronic signature. This ship is the last of eight series ships built for the shipowner in the Changbo factory area of Yangzi Xinfu Shipbuilding Co., Ltd.

 N20801800TEU集装箱船“CELANDINE”-45a4172980354234996950231fa68074

 20220526【开工】N20801800TEU集装箱船(9001cc金沙以诚为本长博造)开工典礼_副本-59cfe43dd41e4b92830ce628fa0e29ea

Thanks to this batch of vessels, Yangzi Xinfu-Changbo plant is now under normal management and production, and the production plan has been scheduled until 2027, laying a foundation for the subsequent construction of difficult vessel types.

 微信图片_20230621132834-665d2a8f24834f0d9ae12e73b7103515

 


【网站地图】